Showing posts with label daunting. Show all posts
Showing posts with label daunting. Show all posts

Wednesday, February 17, 2010

Becoming a Bi-Athlete

Just as the real Olympics have the biathlon...my knitting Olympics are also swiftly turning into a combo-event. Only instead of skiing and shooting, I am juggling multiple projects.

I initially signed on to knit the blue mohair cinema shawl for my Knitting Olympics project. I waited patiently, and then cast on during the And it is progressing at a snail-slow but steady rate.

However, at the same time...I have a stack of felted purses to finish as samples for the class I am giving next Wednesday at the library. And by stack, I mean seven...which are at various stages of done-ness. (I couldn't count the purses as my official Knitting Olympics project because many of them were in progress before the Opening Ceremonies.)

I have been alternating back and forth...mohair shawl, purse a's strap, mohair shawl, purse b's body, purse a's strap, mohair shawl...etc.

Now I am starting to worry that not only will I not complete both tasks by their respective finish dates, I might not complete either one.

AAAAAHHHHHH!!!!!

(I comfort myself with the fact that the shawl doesn't have to be done until the 28th, and the purses (finished or not) can be set aside after the 24th. That gives me FOUR WHOLE DAYS of non-stop (except for work and school) shawl knitting to play catch up in.)

Monday, January 25, 2010

How Did That Happen?

Somehow I have a pressing queue of time sensitive projects.

A queue which is bordering on the insanity of a Christmas queue!

It includes:
  • Additional samples for the felted purse class

  • Baby burp rags for friends who continue to reproduce

  • The birthday gift for Sis-In-Law, which I am really enjoying making

  • Commission wrist warmers and fingerless gloves (technically these don't have a due date...but it would probably be best to deliver them while it is still cold!)


In addition to these items...I also have several things that I would like to make for me!

I am only one knitter. I can only do so much.

(Breathe in. Breathe out. Remind myself that the fate of the world does not depend on my completing knitting projects. And be grateful for it.)

Sunday, January 17, 2010

Well...That's Interesting...Now What?

So, I have been diligently working on the Martinelli Sweater...between all of my time sensitive projects.

I have completed the body, and the straps.

The whole pattern was very clear and straightforward, so I didn't encounter any real snags...until now...when I tried it on before picking up the sleeve stitches...

I had known all along that I was going to have to a camisole under the sweater because the lace pattern is fairly open. What I hadn't banked on was the immensity of the neckline. I feel very exposed. The neckline is high enough that it covers all the important bits...it is just very very very wide. There is no way to not show bra and cami straps. I would have to wear a strapless and a tube top.

Had I realized earlier that this would be the case I would have knit much wider straps.It wouldn't have been that big a deal. Now I am wondering if I need to un-graft the straps, unravel them, and start over with 20-30 stitches instead of the 9 the pattern called for. I hate working backwards. I would rather just cobble together a fix than backtrack. (Remember the peach baby kimono that I put off frogging for a year or two? Yeah. I don't backtrack well or willingly!)

I think I may have a solution...but if it doesn't work, it will just aggravate the problem. The sleeves, which are stockinette, have a six row garter stitch border. So, I'm thinking, that I can pick up stitches all around the neckline and do a 6 row garter there too. I think that I will need to mark the corners, since the neckline is kind of square, so that I can miter there...otherwise the border will poof out. Not sure.

I guess I will go ahead and knit the sleeves, see how it looks with them on...like somehow the problem will magically fix itself (I am the queen of wishful thinking)...and then reevaluate.

Ugh.

Monday, December 7, 2009

Insanity...Thy Name is Mine

I had a LONG Christmas queue this year. Long in quantity, but not necessarily in difficulty. A lot of the projects/gifts that I had decided to make were verystraightforward knits. They were things that, generally speaking, I could knock off in fairly short order.

The problem was that even if a project by itself is fast and simple, when you add a gazillion more fast and simple projects to it...well...

I am crazy.

I started planning and knitting the Christmas queue way back in October.

Still not done.

In addition to my own projects this year, I took on several commissions for the holidays. Don't ask me why. I don't know.

All of the commissions were also straight forward simple knits. When I was asked, I thought, "Of course! That is an easy peasy project. It will take no time!"

But again, get enough easy peasy projects in a queue and you have a huge mountain of knitting. So, these just add to the general insanity of my life. Not to mention the fact that commissions need to be delivered on time...and in my case, on time means early since I am going to my parents for the holidays. Unlike my own gifts, I can't IOU a Christmas commission.

Oh, and just to make myself even more loopy, or because I was already loopy...I actually knit 7/8 of a gift for a family member. Then I decided that it was utter rot and I needed to do something entirely different. Hours of knitting gaily abandoned and additional hours tacked on. (In my defense, the original project was a good idea conceptually, and I knit it perfectly according to the pattern...the pattern was just cruddy and not at all what I had envisioned...) Then the back up project also wasn't working out, so I have abandoned it as well. Hopefully, the third time will be the charm.

Now I sit here, on my floor, surrounded by project bags. I have put each project, its pattern, extra yarn, and needles into its own bag in order to stay organized. I am literally overwhelmed by organization. It is a huge ordeal to prioritize what needs to be knit now, what can be put off...if I put it off will I still be finished with it on time? Not to mention having to take into account who will be around while I'm knitting it. Oh the agony!

Thinking positively...I am almost done with the queue...I am almost done with the queue...I am almost done with the queue...

Tuesday, October 27, 2009

Incompatibility

I have a knitting blog. (Which you probably know, because you are currently reading it.)

On said knitting blog, which I committed myself to updating every other day, I discuss my current projects, successes, epic failures, and quirks.

I also have something called the Christmas Queue, which is the list of all the gifts I need to make by Christmas.

The Christmas Queue essentially devours all available knitting time from approximately September 1 through December 24. (And often later, since I tend to give out gift IOUs.)

The recipients of projects on the Christmas Queue have 2 things in common.

1. I love them
2. They are the vast majority of people who read this blog!

There is a definite incompatibility problem here. I want to blog about what I am knitting, I want people to read my blog, and yet I don't want anyone's Christmas surprise to be spoiled.

It is a conundrum.

Thursday, October 15, 2009

Just Keep Winding

just keep winding...just keep winding, winding, winding!

1000 yards of lace weight takes FOREVER to wind on a nostepinde. (Although, I am betting it would still take a long time even if I had a mechanical ball winder.)

Total Time Elapsed, Measured in Things Viewed While Winding:

2 hours - graduate school lectures
1 hour - Castle Episode
2 hours - Biggest Loser Episode
1 hour - House Episode
1 hour - Lie to Me Episode
1 hour - NCIS Episode
1 hour - NCIS: Los Angeles Episode
___________________________________________

9 hours total

Open message to all spinners/dyers/yarn manufacturers: If you are going to sell yarn in quantities that exceed a half mile in length, the polite thing to do is pre-ball them. Thank you.

By The Way: The yarn was some of Blue Heron Yarns' Egyptian mercerized cotton in "Deep Blue Sea" that I bought on sale when my favorite LYS in WA was going out of business.

Wednesday, September 9, 2009

Sometimes I Impress Myself

I took several projects with me to work on on my WA trip last weekend. Specifically: Les Tuileries, a chunky cabled beanie, the last of the Cousins Beanies...and the Rivendell socks.

I have been "working" on the Rivendell socks for over a year now. I purchased the yarn before I moved to CA. I begged my parents for the Eclectic Sole Book for my 2008 birthday. I even cast on once...only to second guess my yarn choice, rip them out, and proceed to knit several other pairs of socks instead of the Rivendells.

Finally, I decided that enough was enough. The original yarn choice was great, and I was not allowing myself to knit any other socks UNTIL I knit the Rivendells.

Truth is...I was scared of them. They have something called a "yarn cluster"...there is a ton of cabling...they REQUIRE a chart. (I can read charts, I just prefer to use written row by row directions...I am less likely to lose my place.)

Anyway...I psyched myself up and cast them on again this last weekend. With all of the driving we did, and with all of the sitting and chatting and drinking tea...I got quite a bit done.

In fact, I had the whole cuff done before the flight back to CA Tuesday morning.

Frankly...I am pretty stinking impressed with how they are turning out. That may not be a humble admission, but it is the truth!

I am proud of me.

(Since the picture was taken, I have actually finished the heel flap and picked up the gusset stitches...the rest of the sock is simple straight-forward vanilla knitting, easy, breezy, and beautiful...I'm just not thinking about the fact that I have TWO feet!)

Friday, June 19, 2009

Swamped

I had 27 people show up to the knitting program at the library Wednesday night.

Let me repeat that:

27 PEOPLE

And not just 27 knitters to sit around and chat and knit. No.

I had 27 brand spanking new beginners who could barely tell the needles from the yarn!

This was unexpected.

27 knitters...and me. (And a lovely teen volunteer who happened to know how to knit and was a good sport about helping me at the last minute...I totally owe her a coffee cup cozy!)

We knew there was going to be a big turn out based on the PR and the amount of response we had been getting. (And the number of supply sheets I had to print out!) Yet, I did not freak out. I did not have a panic attack...

Until the power point projector did not recognize that my laptop was connected to it even though clearly it was...I thought it might be the type of cable I was using, so I rushed home (mercifully without getting a ticket for breaking the sound barrier) and grabbed every single connector that I owned. I got back 10 minutes before I was supposed to start. It didn't matter. Nothing worked.

That's ok. I took a deep breath and decided to pretend that I don't have a diagnosed stress disorder for which I have been medicated in the past. I pasted a smile on my face, pulled out my wonking huge demonstration needles, and went to work.

By the end of the evening, we had all made great progress...and everyone was knitting:



(The real shame is that I spent 5-6 hours working on that power point presentation...I even had NorCalGal email me a photo of her first dishcloth to include in it...that slide show was a thing of beauty I assure you! I am tempted to go ahead and post it here in the next week or so...I would just need to record the voiceovers...We'll see...)